Service 02 / Factory Setup
A FACTORY PLAN THAT MAKES SENSE
ON THE PRODUCTION FLOOR
Plant layout, equipment choices, utilities, and process flow—all engineered around the product you actually need to make.
Plant Engineering
Design flow first. Then select the equipment.
We align physical operation with product, output target, people movement, utility demand, and compliance constraints before a capital decision becomes expensive to reverse.
Core Pillars of Factory Setup
Map material, people, and process movement into a lean, scalable factory footprint.
Build equipment specifications that fit product throughput and operating targets.
Connect setup choices to initial trial runs, line acceptance testing, and operating SOPs.
Operational Roadmap
FROM EMPTY FOOTPRINT TO WORKING PLANT
Site & Capacity
Target output, category requirements, material flow, and utility parameters.
Layout Options
Civil zones, cleanroom classification, HVAC piping, and process adjacency.
Machine Selection
Vendor evaluation, technical parameters, FAT testing, and integration briefs.
Line Trial
SAT acceptance testing, operator training, SOP documentation, and handover.
Factory Setup FAQ